Sunday, April 12, 2009

Some "Before and After" Pictures

It's been two months since I posted anything, and I'd like to say all that time was spent working on the loft. It wasn't but we do have some things to show for the wait. Here's the twin sized Murphy bed filling the cinder block niche created when a freight elevator shaft was closed.